Top
We are ready to manage projects of any complexity, We are turnkey contractors
Doing jobs in the field of Civil, Mechanical, Piping, Electrical, Fire fighting, HVAC, etc, HP & LP Piping (AS, SS, CS, AL, etc.).
Substations, Area Lighting, Hot Dip Galvanized Transmission Towers, etc Cell phone towers
Ash handling system, Coal Handling system
Dairy Plants, Capital repairs Boiler overhauling
Water conducting system Canal Lining, Tank farms
Steel Chimney (done up to 110 meter) Gas Scrubbers for Coke oven byproduct

Our Electrical Projects(under Execution / already completed)

CENTURY PULP & PAPER, LALKUA (UP)

The complete electrification of Pulp Mill including erection of High Tension (HT) sub-stations, HT and Low Tension (LT) Power Control Centers (PCCs) / Motor Control Centers (MCCs), Earthing, Illumination, Digital Control Systems (DCSs), HT & LT cabling, etc., had been done by us. We have also designed; fabricated and erected 3 nos. 25 meters steel Lattice Lighting Towers.

BHARAT HEAVY PLATES & VESSELS LTD / BSL, BOKARO

We have completed work of HT & LT Electrification work at Bokaro Steel Plant inthe SMS zone.

VHF ANTENNA TOWERS for BPDB, DHAKA, BANGLADESH

We had designed, fabricated and shop erected 16 nos., 20 meters high Very High Frequency (VHF) hot dip galvanized Steel Lattice Antenna Towers for Bangladesh Power Development Board (now BPDB), Dhaka. This was an export job against a global tender. The total design was done by us and approved by their Foreign Consultant.

VESUVIUS INDIA LTD, Kolkata.

Electrification controls of fully automatic Blender Plant including PLC supply, installation and programming was done by us for their plant at Kolkata.

IFFCO, AONLA (UP)

We successfully completed the electrification for Duel Firing System at IFFCO Fertilizer Unit, Aonla, within the scheduled time.

DAMODAR VALLEY CORPORATION

The design, manufacture & supply of 50 nos. Feeder Pillars for colony illumination & electrification was done by us for DVC.

ELECTRO MEDICAL & ALLIED INDUSTRIES LTD (EMAIL)

We have completed electrification work of the electrical equipments of “PVC BLOOD BAG PROJECT” at Salt Lake City, Kolkata. The work involved erection of main power control center, supply & erection of local distribution board, switch socket outlet, cabling and earthing work.